The project’s aim is to design and prepare a conceptual and detailed design as well as detailed Engineering for New Capital City WTP Phase (1) with capacity of 400,000 CMD.
Project Contractor: Hassan Allam Construction (HAC)/Orascom JV
Technical Brief; the project consists number of building that includes a pumping, settling, filtration stations and storage reservoirs
Date: September 2021
Scope of Services:
Types of Activities: