The project aims to prepare the surge analysis for the product water transmission lines from Fouka Desalination Plants to the final destination points
Technical Brief; The hydraulic analysis and surge protection system will be done to carbon steel pipes with DN 1400mm and 900mm with length of 9000 m and 500 mm with operating pressure of 23 bars.
Date: 2023
Scope of Services: