King Faisal Academy STP – 6,000 CMD

Project NameKing Faisal Academy STP - 6,000 CMD
Client NameWETICO
LocationMajmaah, KSA

   The project’s aim is to prepare the conceptual and detailed designs as well as the Shop Drawings of King Faisal Air Academy (KFAA) sewage Treatment Plant with a capacity of 6,000 CMD as well as an admin building.

Technical Brief; The project consists of a number of units: a preliminary treatment unit, an MBBR system unit, tertiary treatment unit and a sludge dewatering unit.

Date: March, 2022

Scope of Services:

  Conceptual design
  Design development
  Detailed design
  shopdrawings
•  BIM

Types of activities:

  Architecture
  Structure
  Electrical
  Light current systems
  Fire Fighting
  HVAC
  Plumbing
  Landscape