The project’s aim is to prepare the Hydraulic study & Construction supervision for the Suction and Drain pipelines for desalination treatment plant at Blue Blue Resort-Ain Sokhna, The scope includes complete engineering service and supervision during construction. The activities consisting of the hydraulic and mechanical design works and complete tendering package with bill of quantities and all technical specification
Technical Brief; The hydraulic analysis study will be done for Suction and Drain pipeline from and to the RO plant.
Date: Oct. 2023