The project aims at design preparing conceptual and detailed design, detailed Engineering and Technical support for Radamis Wastewater Treatment Plant 2,400 CMD
Technical Brief; The WWTP is divided into four parts and is located underground with IFAS as the used treatment technology.
Date: Dec. 2023
Scope of work:
Types of Activities: