The project focuses on preparing conceptual and detailed designs, executing detailed engineering, and providing technical support for the Al-Ramla Wastewater Treatment Plant (WWTP) with a treatment capacity of 2,600 cubic meters per day (CMD).
Technical Overview:
-
Plant Design:
- The WWTP is uniquely designed to be entirely located underground, optimizing land use and minimizing environmental and visual impact.
- The facility is divided into two distinct sections to facilitate efficient operation and maintenance.
-
Treatment Technology:
- The plant employs Integrated Fixed-Film Activated Sludge (IFAS) technology, a hybrid system that enhances biological treatment by combining suspended and attached growth processes.
- IFAS improves the removal of organic matter and nutrients, increases treatment capacity, and provides operational flexibility.
-
Project Objectives:
- Develop comprehensive conceptual and detailed designs to meet the specific needs of the plant.
- Ensure compliance with environmental and regulatory standards.
- Deliver robust technical support throughout the project’s lifecycle, ensuring smooth implementation and optimal performance.
This project reflects a focus on innovative design, efficient technology utilization, and sustainable infrastructure development.
Date: Jan. 2024
Scope of Services:
- Detailed design
- Detailed engineering
- Conceptual design
- Technical support
- RFQ
- Shop drawing
Types of Activities:
- Process
- Structure
- Civil
- Instrumentation
- Scada and control
- Electrical
- Mechanical
- Hydraulics
- Architecture