Al-Ramla resort WWTP (2,600 CMD)

Project NameAl-Ramla resort WWTP (2,600 CMD)
Client NameBS Egypt for water and energy
LocationRas El Hekma, Egypt

The project focuses on preparing conceptual and detailed designs, executing detailed engineering, and providing technical support for the Al-Ramla Wastewater Treatment Plant (WWTP) with a treatment capacity of 2,600 cubic meters per day (CMD).

Technical Overview:

  1. Plant Design:

    • The WWTP is uniquely designed to be entirely located underground, optimizing land use and minimizing environmental and visual impact.
    • The facility is divided into two distinct sections to facilitate efficient operation and maintenance.
  2. Treatment Technology:

    • The plant employs Integrated Fixed-Film Activated Sludge (IFAS) technology, a hybrid system that enhances biological treatment by combining suspended and attached growth processes.
    • IFAS improves the removal of organic matter and nutrients, increases treatment capacity, and provides operational flexibility.
  3. Project Objectives:

    • Develop comprehensive conceptual and detailed designs to meet the specific needs of the plant.
    • Ensure compliance with environmental and regulatory standards.
    • Deliver robust technical support throughout the project’s lifecycle, ensuring smooth implementation and optimal performance.

This project reflects a focus on innovative design, efficient technology utilization, and sustainable infrastructure development.

Date: Jan. 2024

 

Scope of Services:

  • Detailed design
  • Detailed engineering
  • Conceptual design
  • Technical support
  • RFQ
  • Shop drawing

Types of Activities:

  • Process
  • Structure
  • Civil
  • Instrumentation
  • Scada and control
  • Electrical
  • Mechanical
  • Hydraulics
  • Architecture