Date of completion: Aug 12th, 2024
EEG-Engineering Experience Group completed a great hydraulic project of “a Hammer protection system for Moatakbal Misr project 300,000 acres” Technical Brief; The hydraulic analysis and surge protection system will be done for HDPE and DCI pipeline with various diameter and length. The diameter ranges from 630-900 mm with length of 7000 m and 5000 mm with operating pressure range of 4-6 bars. From about 300 pumping station EEG-Engineering Experience Group came up with a 10 Surge Protection Package modules that covers the requirement of the 300 pumping station.