The project’s aim is to produced a detailed design as well as shop drawings for HVAC, Plumbing, Firefighting, Electrical and Light current systems for the administration building of SG group.
Technical Brief; The building consists of two basements, a ground floor, three floors and aroof. The total BUA is about 4,000 m2.
• Date: 9/2019
• Scope of Services:
• Types of Activities: