The project’s aim is to prepare a conceptual and detailed design as well as construction drawings of Ultrafiltration plant located in Al-Galalah of capacity 40,000 CMD.
Technical Brief; the project consists of a number of buildings that includes UF Building, UF feed pumping station and other buildings.
Date: May 2021
Scope of Services:
Types of Activities: