The project’s aim is to prepare the detailed design, Sludge treatment system and the tender of the wastewater treatment plant with a capacity of 25,000 to 50,000 CDM in Al-Rass, the capital city of Al-Qassim province.
Technical brief: Al-Rass treatment system consists of the following:
Date: 2011-2012
Scope of Services:
Types of Activities: