The project aims at design preparing conceptual and detailed design of Damanhur Water Treatment Plant (DWTP) with capacity of 51,000 CMD.
• Technical Brief; the project consists number of building that includes shore intake, pumping station, settling, filtration and storage reservoirs
• Date: December 2020
• Scope of Services:
•Types of Activities: