The project aims at reviewing the design of the treated sewage water transmission pipeline from hydraulic point of view.
Technical Brief; Enieza Treated Sewage Transmission Line is used to transfer the treated sewage from Enieza WWTP to the disposal point (Lagoon and Wadi). The total length of the pipeline is 26 km.
Date: 2017
Scope of services:
Types of Activities: