The project’s aim is preparing the conceptual and detailed design of Water Treatment Plant located in Al-Azab Al-gadedah (AGWTP) with a capacity of 120,000 CMD. The main contractors for the project are; The Military Production Company for Projects, Engineering Consultancy and General Supplies شركة الانتاج الحربي للمشروعات و الاستشارات الهندسية و التوريدات العامة and Intech, Hassan Allam.
Technical Brief: the project consists number of building that includes shore intake, pumping station, settling, filtration and storage reservoirs.
Scope of Services:
Types of Activities: