Extension of West Noubaria WTP ‎‎51,000 CMD‎

Project NameExtension of West Noubaria WTP ‎‎51,000 CMD‎
Client NameBeheria‎ Water and Wastewater Company
LocationBeheira , Egypt

     The project’s aim is to design and prepare the conceptual and detailed design of west noubaria water treatment plant with a capacity of 51,000 CMD.

Technical Brief; the project consists of a number of buildings that includes shore intakes, pumping stations, settlings, filtration and storage reservoirs.

Date: March 2021

Scope of Services: 

  • Conceptual design
  • Detailed design
  • Detailed Engineering

Types of Activities:

  • Process
  • Hydraulics
  • Mechanical
  • Electrical
  • Instrumentation and control
  • Structure
  • Architecture
  • Wet utilities
  • Landscape