The project’s aim is to prepare the shop drawings of the electrical system, light current system, HVAC system and other mechanical systems for Faculty of Dental medicine of Al-Galalah university.
Technical Brief; the building consists of a basement, a ground floor with area of 6,000 m2 and 2 floors. The total built up area is about 15,000 m2.
Date: 2018
Scope of Services:
Types of Activities: