The project consist of wastewater treatment plant with capacity of 400,000/600,000 CMD in addition to TSE transmission pipelines with diameter range of 600-1400 mm and length of 30km. The WWTP process consist of preliminary treatment, primary treatment, Biological nutrient removal , tertiary treatment consists of Disc filter ,Ultrafiltration in addition to UV disinfection system. The sludge treatment consists of Thermal hydrolysis, anaerobic digestors,, thermal drying and energy bioenergy generator CHP with 50% power saving
Date: Sep. 2023
Scope of Services:
Types of Activities: