Telal Soul Infrastructure works

Project NameTelal Soul Infrastructure works
Client NameRoya Development
LocationNorth Coast, Egypt

The scope of services for this project included the preparation of the conceptual, schematic and development designs as well as the tender documents for Telal Soul, a resort owned by Roya Developments on the north coast, Al-Alamein city with a total area of 140 feddans. The infrastructure works included the wet utilities, dry utilities as well as an sewage treatment plant and a desalination plant and there process designs. Other requirements involved the MEP, structure and architectural works. A hydrogeological study and wells field design were also requested. 

Scope of Services

  • Concept design
  • Schematic design
  • Development design
  • Tender documents

Types of Activities

  • Wet utilities
  • Dry utilities
  • Hydrogeological study
  • Structure
  • Process (desalination plant and STP)
  • Architecture
  • MEP
  • Hydraulic
  • Firefighting
  • Irrigation 
  • Sewage
  • Storm
  • Medium voltage
  • Low voltage
  • Telecommunication networks