The project’s aim is to prepare the shop drawing pf the electrical system, light current system and the HVAC system as well as other mechanical systems for the CEO building as well as the Administration building.
Technical Brief; each building consists of basement, ground floor and 3 floors. The total built up area is about 20,000 m2.
Date: 2018
Scope of Services:
Types of Activities: