The project’s aim is to conduct the water hammer analysis for potable water transmission line and prepare the detailed design o9n the transmission line.
Technical Brief; The Water transmission line from PS3 to PS4 is of length 5 km carrying water from 10th of Ramdan City water treatment plant.
Date: 2018
Scope of Services:
Types of Activities: